<<< Previous
Index
Next >>>
In the foreground, you can see part of the garage framing on the left, and the maze on the right, including the terrace stairs. In the background on the left, the forms for the guest suite foundation have been poured. Continuing to the right, you can see the steel for the A/V room, the back of the main house, and the bedroom wing.
Date: 22 Feb 2002
Copyright © 2001, 2002, 2003 Glenn P. Parker, All Rights Reserved.