<<< Previous     Index     Next >>>

Rough framing for the bedroom wing is complete. The floor of the master bedroom, closet, and bath, are covered with a mesh to which the radiant heating tubes will be attached.

Date: 25 Apr 2002

DSC01170-pan.jpg
Copyright © 2001, 2002, 2003 Glenn P. Parker, All Rights Reserved.