<<< Previous
Index
Next >>>
Installing a lead-coated copper drip edge over the limestone cap. This sits just under the bottom of the cedar siding.
Date: 2002 May 24
Copyright © 2001, 2002, 2003 Glenn P. Parker, All Rights Reserved.