<<< Previous     Index     Next >>>

The concrete floor of the main entrance is poured on top of the radiant heat tubing.

Date: 2002 Sep 27

DSC02376.jpg
Copyright © 2001, 2002, 2003 Glenn P. Parker, All Rights Reserved.